sojusucks

Joined: 31 May 2008
|
Posted: Mon Jun 06, 2011 10:31 pm Post subject: Anyone notice a problem with Line 1 on Monday? |
|
|
http://www.koreatimes.co.kr/www/news/nation/2011/06/117_88435.html
| Quote: |
Railroad operations came to a halt for nearly six hours at Uiwang Station in Gyeonggi Province after a piece of drilling equipment fell onto the tracks Monday, the Korea Railroad Corp. (Korail) said.
Korail said it has cleared the 20-meter drilling equipment which fell across three of the four tracks at 4:25 a.m near Uiwang Station, south of Seoul, putting railroad operations back to normal.
|
|
|